Products
The 50-75HP refrigeration screw compressor produced by DMZL is an efficient and energy-saving refrigeration equipment, which
has the following characteristics:
1. High efficiency: Adopting a unique screw rotor structure, it achieves high energy conversion efficiency and reduces energy
consumption.
2. Low noise: Advanced vibration isolation and noise reduction technology is adopted to reduce noise pollution during operatio.
3. High reliability: The use of high-quality raw materials and strict production processes ensures the high reliability and long
service life of the equipment.
4. Strong scalability: Customized design according to different needs to meet refrigeration needs of different scales.
5. Good environmental performance: Using environmentally friendly refrigerants reduces the impact on the environment.
6. Strong adaptability: It can be applied to various freezing and refrigeration scenarios, such as industrial production, food
processing, medical refrigeration, and other fields.
7. Easy maintenance: Adopting a modular design makes it easy to repair and replace parts, reducing maintenance costs.
Related technical parameter table:
1. Open box inspection: After receiving the equipment, first check whether the packaging is complete and whether the
components are complete. If there is any missing or damaged, please contact the supplier in a timely manner for replacement.
2. Installation and debugging: Install the compressor in the appropriate position according to the requirements of the equipment
manual, and ensure that the power cord is connected correctly and without errors. Then, necessary debugging work is carried
out according to the equipment requirements, such as adjusting the refrigerant filling amount, setting operating parameters,
etc.
3. Startup and operation: Turn on the power of the device and observe its operating status. After confirming the normal
operation of the equipment, the actual refrigeration operation can begin.
4. Monitoring and maintenance: During the operation of the equipment, attention should be paid to observing its operating
conditions, such as temperature, pressure, and other parameters. Once any abnormal situation is discovered, timely measures
should be taken to handle it. In addition, regular maintenance and upkeep should be carried out on the equipment to ensure
that it is always in good working condition.
5. Shutdown and shutdown: When the equipment no longer needs to run, please turn off the power first, and then follow the
requirements of the equipment manual to shut down. During the shutdown process, it is important to observe the status of the
equipment and ensure that it has completely stopped before proceeding to the next step of operation.
6. Storage and transportation: During the idle period of the equipment, please store it in a dry and well ventilated place,
avoiding direct sunlight and humid environments. During transportation, it is necessary to ensure the integrity of the equipment
packaging and avoid collision and compression.
WARNING!
1. Oxygen pressure testing is strictly prohibited for the compressor unit, and nitrogen pressure testing without a safety valve is
strictly prohibited. Improper use may cause explosions and casualties. The manufacturer shall not be responsible for any
consequences caused by the above reasons.
2. When assembling the compressor unit and installing an oil separator, 1.5 to 2 liters of refrigeration oil (46 #) must be added to
the oil separator. If the compressor freezes up due to insufficient oil due to not adding refrigeration oil, the manufacturer will not
guarantee repair
3. The compressor is strictly prohibited from being compressed or vacuumed by the main engine. When using an oil pump
lubricated compressor, an oil pressure protection device must be installed (the connection device of the oil pressure controller is
shown in the diagram). If the compressor is damaged due to non compliant use, the manufacturer will not provide warranty.
4. It is strictly prohibited to use methanol to absorb moisture, in order to avoid damage to the motor.
5. All compressors must be equipped with electric heaters. When the compressor is restarted after a long-term shutdown, the
crankcase heating function must be used, otherwise it will cause liquid shock and serious damage to the valve plate, connecting
rod, and crankshaft.
6. The refrigerant must be filled into the system from the high-pressure valve (the system must be in a vacuum state). It is strictly
prohibited to add excessive refrigerant from the suction valve during the operation of the compressor, otherwise it will cause
compressor liquid shock, resulting in valve plate and valve plate fracture, connecting rod damage and locking, causing
unnecessary damage to the user.
7. The cold storage system must be clean. If using pipelines, be sure to install an suction filter device on the suction valve. The
refrigeration oil must be kept clean. If you find that the refrigeration oil is insufficient or dirty, please add and replace the
refrigeration oil as soon as possible.
8. The installation of the wiring device must be securely fixed and then insulated with adhesive. During startup and debugging, it is
necessary to check whether the exhaust valve has been opened. Do not open the suction valve too wide, slowly open it after
operation.
Please read the user manual carefully before use, and follow the operating methods indicated in the manual. If the compressor is
damaged due to improper use, the manufacturer will not provide warranty.